What it looks like
| Goes in | Comes out |
|---|---|
| A set of floor plans and specifications for a small office renovation, plus your current labor and material prices. | A draft estimate with quantities by trade, the unit prices used, a total, and a list of items the tool could not read from the drawings. |
Illustrative example.
How to test AI on this job before you buy
- Choose 10 finished jobs where you know the final cost, and hide the final cost from the tool.
- Run each job's drawings through the tool and compare its total with what the job actually cost.
- Compare the tool's quantities line by line with your estimator's takeoff. Wrong quantities are the usual root of wrong totals.
- Note which items it missed entirely, such as scope buried in the specifications.
- Time the work: hours for the tool plus review versus hours for your estimator from scratch.
Buy or build
Buy: Buy when your jobs are common building types and you want faster takeoffs from standard drawings.
Build: Build when you price special products or processes from your own history and want a model tuned to your own past jobs.
What goes wrong
- Accuracy depends on how complete the design is. An ASTM-based table used by Alberta Infrastructure gives a typical range of minus 30% to plus 50% for the earliest stage and minus 3% to plus 10% for the most complete stage. AI does not remove that gap.
- Your own price data is the main input. Old or wrong unit costs give wrong totals.
- Never let a draft estimate go out as a bid without an estimator's review.
- Note your assumptions and exclusions in writing on every estimate.
Useful resources
- Alberta Infrastructure: Classes of Construction Cost Estimates: Explains the five estimate classes and their typical accuracy ranges, based on ASTM E2516.
- GAO Cost Estimating and Assessment Guide: A federal guide to the steps behind a reliable cost estimate, including risk analysis and updating with actual costs.
Sources
| Source | What it says |
|---|---|
| Alberta Infrastructure: Classes of Construction Cost Estimates | Gives accuracy ranges by class, for example Class 5 at minus 20% to minus 30% low and plus 30% to plus 50% high, and says accuracy improves as the project definition improves. |
| GAO-20-195G Cost Estimating and Assessment Guide | Lists the steps of a cost estimate, including data collection, estimating methods, sensitivity and risk analysis, and updating estimates with actual costs. |
Related: AI document processing: reading invoices, forms and files · AI contract review: what it catches and how to test it · Route optimization software: plan better delivery routes